CCR Rule Compliance Data and Information

Press Enter to show all options, press Tab go to next option


Platte Generating Station

1035 Wildwood Drive
Grand Island, NE 68801

P.O. Box 1968
Grand Island, NE 68802-1968

Phone: (308) 385-5468
Email: Email Platte Generating Station

Citizen Concern Request


The U.S. Environmental Protection Agency (EPA) published the final rule for the regulation and management of coal combustion residuals (CCR) under subtitle D of the Resource Conservation and Recovery Act (RCRA) on April 17, 2015.  The rule – effective on October 19, 2015 – applies to electric utilities and independent power producers that fall within NAICS code 221112 and the facility produces or stores CCR materials in surface impoundments or landfills.  This regulation applies to the City of Grand Island’s coal-fired power plant – Platte Generating Station (PGS).  The CCR rule requires owners or operators of CCR landfills and CCR surface impoundments to develop plans, reports, demonstrations, and notifications that meet the requirements of the CCR rule.

 Coal ash, also referred to as coal combustion residuals or CCRs, is produced primarily from the burning of coal in coal-fired power plants.  Coal ash includes a number of by-products produced from burning coal, including:

  • Fly Ash, a very fine, powdery material composed mostly of silica made from the burning of finely ground coal in a boiler.
  • Bottom Ash, a course angular ash particle that forms in the bottom of the coal furnace.
  • Boiler Slag, molten bottom ash from slag tap and cyclone type furnaces that turns into pellets that have a smooth glassy appearance after it is cooled with water.
  • Flue Gas Desulfurization Material, or sometimes called scrubber ash, a material left over from the process of reducing sulfur dioxide emissions from a coal-fired boiler that can be a wet material consisting of calcium sulfite or calcium sulfate or a dry powdered material that is a mixture of sulfites and sulfates.

As the documents required by the CCR rule are completed by the rule schedule, they will be posted to this CCR web site.

  CCR Landfill 2015 Annual Inspection Report  CCR Fugitive Dust Control Plan
   CCR Platte Closure Plan-Oct 17, 2016  CCR Fugitive Dust Control Report-Dec 19, 2016
   CCR Platte Post-Closure Plan-Oct 17, 2016  CCR Fugitive Dust Control Report-Dec 19, 2017
    CCR Platte Run-on Run-off Plan-Oct 17, 2016  CCR Landfill Annual Inspection Report 2017 
   CCR Landfill Annual Inspection Report 2016  CCR Annual Groundwater Monitoring Report 2017
   CCR Groundwater Monitoring Cert 2017  
  CCR Groundwater Statistical Selection Cert 2017  


Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player QuickTime Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer