Show/Hide

*  Message from the Mayor  *

Residents of Grand Island:

People are asking me for locations in the city where coronavirus may be present.  On March 28, 2020, the Nebraska Department of Health and Human Services determined that we have confirmed cases of community spread of coronavirus in the city.  This means that we must assume that coronavirus is everywhere.  Please take extra precautions using this assumption.   Please keep at least 6 feet of space between you and other people, wash your hands regularly, and do not touch your face. 

Mayor Roger G. Steele

Airport Infrastructure Improvement and Rehabilitation

Print
Press Enter to show all options, press Tab go to next option

Existing gravity and force mains that connect to the Airport are in need of repair and rehabilitation.  Portions of the sewer on Capital Avenue and Skypark Road are in need of point repairs and rehabilitation.  Manholes and lift stations in particular are in need of repair and maintenance.  This project is in the inspection and planning stages.

Tentative timeline:

Design, Engineering, and Construction Cost: planning stages