Asphalt Maintenance; Project No. 2020-AC-1

Print
Press Enter to show all options, press Tab go to next option

The asphalt resurfacing project includes a mill and overlay of the existing asphalt roadways.  This type of construction is a mobile operation and includes short duration driveway closures.  On all roadway segments, traffic will be maintained on one lane of traffic with flaggers through the construction zone.  Please observe the temporary traffic control signs and flaggers.  Before the lay down operation begins, the contractor will spray a layer of fresh oil.  Please do not drive through the fresh oil. 

The following locations are included in this project.

  • Husker Highway; US Highway 30 to Regal Drive
  • Engleman Road; Husker Highway to US Highway 30
  • Schimmer Road; North Road to Blaine Street
  • Blaine Street; Schimmer Road to US Highway 34